The sixth character shall be ‘/’ (slash).The codes for each department shall be as follows: The fourth and fifth character shall denote the department in which equipment is installed.The third character shall be ‘/’ (slash).The first and second character shall be ‘EQ’ denoting equipment.Equipment Numbering: Equipments installed in various departments shall be assigned unique ID.Note: The numbering of Sieves and Screens shall be done as per SOP titled “Control of Sieves and Screens of different equipment” (-–), numbering of Change Parts of various equipments shall be done as per SOP titled “Control of Change Parts” (-) and numbering of Dies and Punches shall be done as per “Control of Dies and Punches” (-). In-process SS Items : Any SS item which is supposed to be in direct contact with the product or its ingredients during dispensing, sampling or manufacturing operations.Sub-Equipment : The sub equipments are the equipments installed on the main equipment meant for recording various process parameters during run of that equipment.Department Head & QA Head shall be accountable for implementation of this SOP.Head-Quality Assurance shall ensure the implementation and compliance of this SOP.to equipments, sub-equipments and in-process SS items of their respective departments. Head of departments or his / her designee shall be responsible for assigning ID.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |